Planning tool

Estimate sealant quantity.

Convert the designed joint dimensions and total run into an estimated number of packs. Use measured dimensions—not a guessed bead size.

Estimated order quantity

2 packs

550 ml including waste (500 ml theoretical fill).

Calculation

Width × depth × length.

For a rectangular bead, width in millimetres × depth in millimetres × length in metres gives the theoretical volume in millilitres. The tool adds the chosen waste allowance and rounds up to complete packs.

This is a purchasing estimate, not a joint-design recommendation. Actual consumption changes with joint variation, backing, tooling, starts and stops, unusable pack residue and site waste. Confirm permitted dimensions, backing and pack volume in the current product documentation and project detail.

For a worked explanation, read the sealant quantity calculation guide.

Check before ordering

Need help with pack size or product choice?

Share the joint schedule, product, colour, quantity and required date.